| SL. NO. | DRAWING TITLE | |||||||
| A. | Basic Engineering Drawings : | |||||||
| 1 | Key SLD | |||||||
| 2 | Protection & Metering SLD | |||||||
| 3 | Site layout plan | |||||||
| 4 | Electrical layout Plan & Elevation of switchyard | |||||||
| 5 | Electrical equipment and cable trench layout for control Room building | |||||||
| 6 | SCADA block diagram and I/O List | |||||||
| 7 | SLD of 400V ACDB | |||||||
| 8 | SLD of 110V DCDB | |||||||
| 9 | SLD of 48V DCDB | |||||||
| 10 | SLD of 400V BMK for Switchyard | |||||||
| 11 | SLD of 400V Overall lighting distribution | |||||||
| 12 | Switchyard cable trench layout and trench sectional details | |||||||
| 13 | DSLP Layout of Switchyard | |||||||
| 14 | DSLP calculation for Switchyard | |||||||
| B. | Technical specifications for : | |||||||
| 1 | 220 KV (110kV) CB, Isolator,CT,CVT,PT,LA | |||||||
| 2 | 20kV Indoor switchgear | |||||||
| 3 | Power Transformer | |||||||
| 4 | 220 KV (or 110kV) Control & Relay panel | |||||||
| 5 | 400 / 230 / 110V DBs | |||||||
| 6 | 110 V DC Battery and Battery Charger | |||||||
| 7 | 48 V DC Battery and Battery Charger | |||||||
| 8 | HV, LV Control & Power Cable | |||||||
| 9 | Fiber optic communication system | |||||||
| 10 | SCADA system | |||||||
| 11 | Lighting fixtures | |||||||
| 12 | Steel structures, Clamps, Connectors, Insulators, conductor, Al tube bus, cable glands, lugs, earthing and lightning protection material | |||||||
| C. | Detail Engineering Drawings (To be submitted after approval of basic engg. Drawings) : | |||||||
| ELECTRICAL | ||||||||
| 1 | Earthing Layout Plan & Eqpt Earthing Details for Switchyard | |||||||
| 2 | Lighting Layout, SLD & Details of SWYD | |||||||
| 3 | Lighting and small power Layout & SLD of Control Building and other facility buildings | |||||||
| 4 | Erection Key Diagram - plan & elevation of Switchyard | |||||||
| 5 | Bay interlocking diagrams and control terminal plan of BMK | |||||||
| 6 | Power cable schedule and interconnection diagram | |||||||
| 7 | Control cable schedule and interconnection diagram | |||||||
| 8 | Short circuit force calculation for strung bus | |||||||
| 9 | Short circuit force calculation for Rigid tubular bus | |||||||
| 10 | Sag & tension calculation for strung bus | |||||||
| 11 | Outdoor lighting calculation | |||||||
| 12 | Indoor lighting calculation | |||||||
| 13 | Earthing calculation for Switchyard | |||||||
| 14 | PS class CT Vk calculation | |||||||
| 15 | HV, LV cable sizing calculations | |||||||
| CIVIL | ||||||||
| 1 | Overall Foundation Layout Showing cable trenches, roads, boundary wall, drains, Oil Collection pits | |||||||
| Foundation RC details of : | ||||||||
| 2 | 220 (110) KV Lightning arrestor | |||||||
| 3 | 220 (110) KV Capacitive Voltage Transformer | |||||||
| 4 | 220 (110) KV Line Gantry Tower with peak | |||||||
| 5 | 220 (110) KV Main Bus Tower | |||||||
| 6 | 221 (110) KV Transfer Bus Tower | |||||||
| 7 | 220 (110) KV Post Insulator | |||||||
| 8 | 220 (110) KV Isolator with & without earth switch | |||||||
| 9 | 220 (110) KV Current Transformer | |||||||
| 10 | 220 (110) KV Transformer Gantry Tower | |||||||
| 11 | 220 (110) KV Circuit Breaker | |||||||
| 12 | Typical Details of HD Foundation Bolts | |||||||
| 13 | 20KV Lightning arrestor ( LA ) & Post Insulator ( PI) | |||||||
| 14 | 20KV Isolator | |||||||
| 15 | Foundation details for 16 MVA (4MVA for 110kV S/S) Transformer | |||||||
| 16 | Foundation Details 250 KVA Station transformer | |||||||
| 17 | Foundation Details 20kV 2 pole structure for outgoing feeders | |||||||
| Civil Design calculations : | ||||||||
| 18 | Design calculations for equipment and gantry foundation | |||||||
| 19 | Design calculations for transformer foundation | |||||||
| STRUCTURAL | ||||||||
| General arrangement of Structures for 220 (110) KV Switchyard for : | ||||||||
| 20 | Overall Structural layout of the Switchyard | |||||||
| 21 | Lightning Arrestor | |||||||
| 22 | Capacitive Voltage transformer | |||||||
| 23 | Line Gantry Tower with Peak | |||||||
| 24 | Main Bus Tower | |||||||
| 25 | Transfer Bus Tower | |||||||
| 26 | Post Insulator ( PI ) | |||||||
| 27 | 3 Phase Isolator | |||||||
| 28 | Current Transformer ( CT ) | |||||||
| 29 | Potential Transformer ( PT ) | |||||||
| 30 | Transformer Gantry Tower without Peak | |||||||
| 31 | Gantry Beam type-1 | |||||||
| 32 | Gantry Beam type-2 | |||||||
| 33 | 20KV Lightning arrestor ( LA ) & Post Insulator ( PI) | |||||||
| 34 | 20KV Isolator | |||||||
| 35 | Design calculations for equipment and gantry structures | |||||||
| SCADA & FO COMMUNICATION | ||||||||
| 36 | Overall Block diagram and BOQ of SCADA | |||||||
| 37 | Overall Block diagram and BOQ of FO communication | |||||||
| AC & VENTILATION | ||||||||
| 38 | Technical specification for AC & Ventilation Equipment | |||||||
| 39 | AC & Ventilation equipment layout in Control Building | |||||||
| 40 | SLD-415V AC & Vent system MCC | |||||||
| FIRE PROTECTION SYSTEM | ||||||||
| 41 | Technical Spec. for Fire detection, alarm & protection System | |||||||
| 42 | Fire Detection & Alarm System Layout | |||||||
| GENERAL | ||||||||
| 43 | Overall BOQ of all Electrical, SCADA, FO communication, AC & Ventilation and Fire Protection Equipment | |||||||
| 44 | Drawing Control Sheet | |||||||
| D. | Bid Evaluation, Technical Recommendation and Procurement Assistance | |||||||
| E. | Vendor drawings review | |||||||