Test
...
| Scope of Work | |
| Sl. No. | Description |
| 1 | Civil drawing and design calculation for 15MVA Power Transformer |
| 2 | Civil drawings and design calculations for indoor and outdoor cable trenches, |
| BOQ of cable tray, rack, supporting steel and accessories | |
| 3 | Equipment and cable trench / tray layout of Control building showing arrangement and BOQ of supporting frame for mounting of panels in ground floor and first floor |
| 4 | LT Power and Control cable schedule for 132kV, 33kV and F.O system |
| 5 | BOQ of 33kV Cable termination and 33kV Cable schedule |
| 6 | Block diagram, Technical Spec and BOQ of Fiber optic communication system |
| 7 | Fire protection system – Review of vendor prepared documents |
| 8 | To review the Clamp & Connector vendor drawings and answer to queries raised by supplier. |
| To prepare the BOQ of Clamps and connectors for Shield wire in Substation | |
| 9 | Design calculation and drawing of Fire Water tank and capacity of the tank’ |
| 10 | Capacity of and calculation of Fire pumps |