Test completed project
...
The project includes preparation of following drawings and design calculations for the EBOP system :
1. Electrical equipment layout of all Load center substations.
2. Cable trench layout, DSLP layout, Earthing layout, Lighting layout drawings.
3. Lighting SLDs.
4. Power and control cable schedule and interconnection diagrams.
5. BOQ of all cabling, earthing, lightning protection and lighting materials.
6. Steel structural drawings for cable trestles.
7. Electrical design calculations for lighting systems.
8. Civil design calculations and foundation drawings for support structures of cable trestles.
9. Site visit, discussion with S & WL, Abhijit Group on many occassions.