Test completed project
...
(Photo is indicative, not real)
Scope of Work :
| A. | Structural GA drawing with BOM and weight of the following : |
| A.1 | 132kV : |
| 1 | Gantry tower type C1 |
| 2 | Gantry tower type C2 |
| 3 | Gantry tower type C3 |
| 4 | Gantry tower type C4 |
| 5 | Gantry beam type BT1 |
| 6 | Gantry beam type BT2 |
| 7 | Gantry beam type BT3 |
| 8 | Gantry beam type BT4 |
| A.2 | 33kV : |
| 1 | Gantry tower type C5 |
| 2 | Gantry tower type C6 |
| 3 | Gantry tower type C7 |
| 4 | Gantry tower type C8 |
| 5 | Gantry beam type BT5 |
| 6 | Gantry beam type BT6 |
| 7 | Gantry beam type BT7 |
| 8 | Gantry beam type BT8 |
| A.3 | Design calculation for 132kV structures |
| A.4 | Design calculation for 33kV structures |
| B. | Checking and necessary modification in Design of RCC foundations for : |
| 1 | Gantry tower type C1 |
| 2 | Gantry tower type C2 |
| 3 | Gantry tower type C3 |
| 4 | Gantry tower type C4 |
| 5 | Gantry tower type C5 |
| 6 | Gantry tower type C6 |
| 7 | Gantry tower type C7 |
| 8 | Gantry tower type C8 |
| 9 | Modification of foundation drawings |
| C. | Erection key diagram plan & elevation including BOQ of clamps, connectors, conductor, AL Tube (if any), tension/suspension string and insulators. |