Test completed project
...
The project includes preparation of following drawings and design calculations :
1. Protection and metering SLDs of 132/33kV switchyard, 415V LV Switchgear, ACDB, MLDB, ELDB, 220V DCDB, 48V DCDB and Lighting DBs.
2. Switchyard electrical layout, EKD, cable trench layout, DSLP layout, Earthing layout, Lighting layout drawings and associated electrical design calculations.
3. Control schematics, interlocking diagrams, terminal plans of BMK, CT & PT JBs.
4. Power and control cable schedule and interconnection diagrams.
5. Steel structural drawings and design calculations for lattice type towers, beams and equipment support structures.
6. All electrical and structural design calculations such as Earthing calculation, Lightning protection calculation, Lighting calculations, PS Class CT dimensionsing, Short circuit force calculations etc.
7. Site visits, Data collection, Measurements at existing substations, Discussion with WBSETCL for checking feasibility of various engineering options.
8. Preparation of Technical specifications, Bid evaluation and Vendor drawing reviews.