Test completed project
...
| SL. NO. | DESCRIPTION |
| A. | ELECTRICAL DRAWINGS : |
| 1 | SLD |
| 2 | ELECTRICAL LAYOUT & ELEVATION, EKD |
| 3 | CABLE ROUTING, TRAY & TRENCH LAYOUT AND DETAILS |
| 4 | EARTHING LAYOUT & DETAILS |
| 5 | LIGHTNING PROTECTION LAYOUT & DETAILS |
| 6 | ILLUMINATION AND SMALL POWER LAYOUT |
| 7 | CONTROL SCHEMATICS & BLOCK DIAGRAMS |
| 8 | CABLE SCHEDULE & INTERCONNECTION DIAGRAMS |
| 9 | SCADA SYSTEM |
| B | ELECTRICAL DESIGN CALCULATIONS |
| C | STRUCTURAL GA DRAWINGS WITH BOM AND WEIGHT |
| D | CIVIL CONSTRUCTIONAL DRAWINGS AND DESIGN CALCULATIONS |
| 1 | Overall foundation layout of 132/33kV switchyard |
| D.2 | GANTRY TOWER AND EQUIPMENT FOUNDATION DETAILS |
| D.3 | CIVIL CONSTRUCTIONAL DETAILS AND ARCHITECTURAL DETAILS OF 132kV GIS HALL & RELAY ROOM |
| D.4 | CIVIL CONSTRUCTIONAL DETAILS AND ARCHITECTURAL DETAILS OF 33kV SWGR. CUM CONTROL BUILDING |
| D.5 | CIVIL CONSTRUCTIONAL DETAILS AND ARCHITECTURAL DETAILS OF FIRE FIGHTING PUMP HOUSE (FFPH) |
| D.6 | CIVIL AND ARCHITECTURAL DETAILS OF PUMP HOUSE AT COLONY AREA |
| D.7 | CIVIL AND ARCHITECTURAL DETAILS OF SUMP PUMP HOUSE |
| D.8 | OTHER CIVIL CONSTRUCTIONAL DETAILS |
| D.9 | MISC. CIVIL DESIGN CALCULATIONS |
| G | ADDITIONAL |
| 1 | Survey & preparation of contour plan drawing (Optional) |
| 2 | Geotechnical investigation (soil bearing capacity, soil resistivity and CBR tests) (Optional) |
| 3 | Overall BOQ for this Project |
| 4 | Obtaining Approval of drawings from WBSETCL |
| 5 | Visit to site, discussion with Bajaj and WBSETCL engineers. |